EN
🇻🇳 Vietnamese (VN)
Chào bạn, Matt đây. Thật sự xin lỗi, tôi đã không nghĩ xa đến vậy, nhưng tôi rất vui vì bạn ở đây.
🇮🇳 Punjabi (IN)
ਸਤ ਸ੍ਰੀ ਅਕਾਲ, ਮੈਟ ਇੱਥੇ। ਸੱਚਮੁੱਚ ਮਾਫ਼ ਕਰਨਾ, ਮੈਂ ਇੰਨਾ ਅੱਗੇ ਨਹੀਂ ਸੋਚਿਆ ਸੀ, ਪਰ ਮੈਨੂੰ ਬਹੁਤ ਖੁਸ਼ੀ ਹੈ ਕਿ ਤੁਸੀਂ ਇੱਥੇ ਹੋ।
🇵🇰 Punjabi (PK)
سلام، میٹ ایتھے۔ سچ مچ معاف کرنا، میں اینا اگے نہیں سوچیا سی، پر مینوں بڑی خوشی اے کہ تسی ایتھے او۔
🇱🇧 Arabic (LB)
مرحبا، أنا مات. عن جد آسف، ما فكّرت لهالقد، بس كتير مبسوط إنك هون.
🇮🇶 Arabic (IQ)
هلا، آني مات. آسف والله، ما فكرت لهالدرجة، بس كلش فرحان بوجودك هنانا.
🇪🇬 Arabic (EG)
أهلاً، أنا مات. بجد آسف، ماكنتش عامل حسابي أبعد من كده، بس مبسوط جداً إنك هنا.
🇲🇰 Macedonian (MK)
Здраво, Мет тука. Навистина ми е жал, не размислив толку однапред, но многу ми е мило што си тука.
🇮🇹 Italian (IT)
Ciao, sono Matt. Mi dispiace davvero, non ci avevo pensato così avanti, ma sono felicissimo che tu sia qui.
DE ANGELIS

Plumpton AI Hub · Matthew De Angelis · 7 November 2026

SAME SHIT,
DIFFERENT CORFLUTE.

I visited the Deanside community action day today. Met a couple of cool heads and had a long yarn with some of the people at the core of it.

I also saw the familiar routine from well-resourced candidates: fucking around for a photo, offering a soundbite condemning the issue. Achieving what?

They want our trust to do the job. Just do the job. Give us something we can check, and we can trust the work.

Anyways, here’s some work. I’ve brought the records and the questions together below, with a letter you can edit and send to the responsible offices. Residents should not have to spend their weekend fronting up and flexing to get basic information and a fair hearing. That’s a blight on government. Respect and basic decency should be where it starts.

One letter. Five inboxes.

Put your name to the request.

Read the full letter below, then edit your email. We’ll verify your reply address before you choose to send.

Read the full open letter

To the relevant ministers, departments and Melton City Council,

I am asking for a coordinated public account of the proposed Plumpton AI Hub. Residents should be able to establish what is proposed near their homes, which rules apply and when they can have a say, without having to assemble the answers from separate filings and announcements.

Please route this letter to the officers and decision-makers responsible for the matters below, and identify one contact who will coordinate the response.

1. Which version is being assessed?

Syncline’s 12 February 2026 AEMO submission described 500 hectares and 3.1 GW. Its 15 February submission described 500 hectares, up to eight centres totalling 3.2 GW and three 200 MW gas turbines. ABC’s 23 September report on Senate evidence described 350 hectares and 2.4 GW.

These may be different versions or stages. Please publish the current site plan, lot list, capacity assumptions and revision history so residents can tell. Identify the entities proposing to build, own and operate the development, and their rights over the relevant land. The neighbouring battery’s addresses and approvals do not establish those facts for the AI hub.

2. Which planning rules apply?

Please provide the application reference, lodgement date, responsible authority and provisions being used. Melton Council’s July update predates the latest statewide expectations; please confirm its current involvement.

The Minister’s Statement of Expectations applies to applications lodged from 23 September 2026, with exclusions for earlier applications and specified amendments. It calls for public notice and online application documents. Please explain its application to Plumpton and publish the actual consultation dates, referral requirements and review rights.

If the relevant DFP provisions remove VCAT merits review, say so clearly. Also identify the public participation opportunities that remain.

3. What are the water and power arrangements?

Victoria’s current Action Plan sets expectations for non-drinking cooling water, offsets for interim drinking-water use, drought response, reporting and infrastructure costs. Please show how the proposed development addresses them.

Please publish the project’s cooling design, annual and peak-day water demand by stage, source and supply capacity, any drinking-water backup, drought restrictions, discharge arrangements and responsibility for network costs. If a supply agreement or capacity assessment exists, please identify and release it to the extent permitted. An agreement for another development does not answer these questions for Plumpton.

Please also publish the proposed electricity supply, grid-connection assumptions, expected gas-turbine operating hours and emissions assessment. Backup generation capacity and renewable energy share measure different things; residents need the assumptions that explain how both would operate.

Identify which bodies assess combined demand on the water and electricity networks and who enforces any resulting conditions.

4. How will neighbours and local roads be affected?

Please release traffic and freight modelling that accounts for the Holden Road level-crossing closure and the conditional Calder Park Drive interchange timetable. Does the modelling assume the interchange is completed before data-centre construction? What happens if the works overlap or the interchange is delayed?

Please include construction and operational truck movements, routes, delivery hours, required road upgrades and who pays for them.

Release the noise assessments, including night-time conditions, generator testing and nearby industrial sources, together with drainage, vegetation, cultural heritage and emergency planning assessments. Identify the proposed limits, monitoring arrangements, complaint process and responsible regulator.

5. What public assets or funding are involved?

The SEC’s investment in the neighbouring battery is separate from the proposed AI hub. Please disclose any proposed shared land, connections, supply contracts or further public investment, and distinguish equity, voting rights and contractual dispatch rights.

Please identify any grants, concessions or infrastructure assistance offered to the AI project, and publish the arrangements used to manage government’s investment, promotion and planning responsibilities.

The SEC’s 2025 Annual Report states that the FOI Act does not apply to SEC Victoria. Please identify relevant records held by departments or ministers and the appropriate access route.

6. Records requested

I request disclosure of the following records, covering 1 January 2025 to the date this letter is sent. Where a request is too broad, please propose a useful narrower scope rather than simply redirecting it.

  • DTP: Current site and lot plans, application references and dates, pre-application meeting records, zoning and pathway advice, and records setting public notice and referral requirements.
  • DJSIR: Meeting records, investment briefs and correspondence with Syncline Energy, Phil Galloway or project representatives, including any Investment Front Door assistance or incentives sought or offered.
  • DEECA: Departmental briefs and correspondence about water, power, SEC involvement, shared land or connections, dispatch arrangements and proposed public co-funding.
  • DPC: Final project briefs and arrangements for coordinating agencies and managing potential conflicts between investment promotion, public ownership and planning assessment.
  • Planning Minister: Held diary entries, meeting notes, briefings and project correspondence about the proposal and its planning pathway.
  • SEC Minister: Briefs, meetings and correspondence about potential supply contracts, shared assets or further public investment connected with the AI hub.
  • AI and Digital Economy Minister: Meeting records, briefs and correspondence seeking assistance or expedited consideration for the proposal.

Please ask Melton Council to provide its current planning involvement, relevant local traffic and drainage records, and correspondence about local infrastructure costs. Please identify any additional records that need to be requested directly from GWW, EPA or another authority.

7. Publish the answers together

Please establish one public project page containing the current proposal, dated revisions, technical assessments, agency advice, public financial commitments, consultation dates and decisions. Include enforceable conditions and a named contact for residents.

If a record cannot be released in full, identify the record and the reason, and release the remainder where possible.

I request acknowledgement within 14 business days, naming the coordinating officer and setting out a timetable for substantive answers. This is a requested response period, not a statutory FOI deadline.

This letter seeks voluntary disclosure. It is not a separate, fee-paid FOI application to every recipient or minister. Please explain where a separate application is needed and which body holds the records.

Residents should not have to organise a campaign just to obtain a clear account of a development proposed beside them. Please put that account on the public record while people can still influence the outcome.

The sender’s name and verified reply address appear below.

Who receives it?

These are the published information-access inboxes. The letter asks them to route the request to the relevant ministers, department heads and council officers. They are not personal ministerial email addresses.

One copy per address, with all five recipients visible. The seven requested sets of records remain in the letter.

Your name and verified reply address are added beneath the message. Please check the wording represents your own views. Leave out other people’s private information.

Preparing email verification…

Sending requests voluntary disclosure. It does not lodge or pay for formal FOI applications. The requested 14-business-day acknowledgement is not a statutory deadline.

Privacy and sending limits

Your details are used to verify your address and send the email. They are not added to a campaign mailing list or published as a supporter list. Recipients receive your name, email, message and any suburb you enter, and may handle them under their own records and privacy policies.

Verification records expire after 15 minutes. Hashed email and IP-based counters are retained for up to seven days to limit repeat sends. Hosting, mail transport and backups may retain operational records; this is not a promise of zero data retention.

One letter per verified email address every seven days; up to three submissions per network address per day. Shared networks may reach that limit. A mail-server acceptance notice does not prove an office has received or read the message.

Site privacy policy

The records and the questions · Updated 7 November 2026

What’s proposed at Plumpton?

1. Start with the version being assessed

Residents should be able to find out what is proposed near their homes, who will decide, and how to have a say while changes can still be made. At Plumpton, even the size of the proposal needs explaining.

These are three dated descriptions, not three approved developments:

RecordFootprintCapacityDetails
12 February 2026 · Syncline to AEMO500 ha3.1 GWEight data centres
15 February 2026 · Syncline to AEMO500 ha3.2 GWUp to eight centres; three 200 MW gas turbines
23 September 2026 · ABC report on Senate evidence350 ha2.4 GWLater description of the proposed hub

The project may have changed. The figures may cover different stages. A dated site plan and revision history would settle that. Until then, using whichever number suits an argument helps nobody.

Gigawatts describe power, not annual electricity consumption. The operating load and hours matter too.

Which land is included?

The neighbouring Melbourne Renewable Energy Hub battery has its own land and planning history. Its addresses and approvals do not establish the AI hub’s boundaries or ownership. Publish the proposed lots, access roads, buffers and service corridors, and identify the entities with the rights to develop them.

2. Who decides, and when do residents get a say?

Melton Council’s 16 July update said it had received informal enquiries but no formal state notification. That is a dated account, not confirmation of the position today. DTP should publish the current application reference, lodgement date and planning pathway.

Under the relevant Development Facilitation Program provisions, the Planning Minister decides and there is no VCAT merits appeal. That does not automatically mean there is no public notice. The particular controls matter.

There has also been a change since July. The Minister’s Statement of Expectations, dated 5 October, applies to applications lodged from 23 September 2026. It calls for notice to neighbours, site signs and detailed application documents online, alongside water-corporation and other referrals.

It excludes earlier applications and specified amendments to them. DTP describes further planning controls as still being prepared. We need Plumpton’s application details to establish which settings apply; the statement alone does not prove what conditions this project will face. Read the statement and its scope.

3. Water: show the demand and the agreement

“Data centre” does not tell us how much water a site will use. Cooling design, weather and operating load change the answer. Nor does “recycled water” mean no water use or no possible demand on drinking-water supplies.

Checked against current Victorian guidance on 7 November 2026: the Sustainable Data Centre Action Plan expects water-intensive cooling to use non-drinking water or have an agreed transition. Interim drinking-water use needs an offset plan. It also sets expectations for drought response, efficiency reporting and developer-funded water infrastructure. These are statewide expectations, not a verified Plumpton supply agreement. Read the water section, pages 12–13.

Greater Western Water has announced a recycled-water connection for AWS in Melbourne’s west. That is a different development. It cannot stand in for answers about Plumpton. GWW’s announcement.

I have not verified a Plumpton-specific demand figure or supply agreement in the records linked here. The letter asks for:

  • Annual demand and the maximum daily requirement during a heatwave, by development stage.
  • The cooling system, water source and confirmed supply capacity.
  • Any drinking-water backup, including its limits during drought or supply failure.
  • Who pays for pipes and upgrades, and whether other users’ supply is affected.
  • Any wastewater discharge, treatment and monitoring arrangements.

Those answers would let residents assess the proposal. Multiplying a headline gigawatt figure by a generic water-use estimate would not.

4. What happens outside the fence?

Power and gas

Syncline’s February submission describes three 200 MW gas turbines. September reporting describes a 75% renewable supply model. Backup capacity and the share of energy supplied are different measurements; one does not disprove the other. Publish the expected turbine running hours, emissions, grid demand and supply arrangements so they can be checked together.

Trucks and the Calder

Freight planning needs to use the roads that will actually be available. Holden Road’s level crossing closed in 2025. The Calder Park Drive interchange timetable remains conditional on approvals in the correspondence published on this site.

How many trucks, on which roads, at what times? Does the model assume the interchange is finished first? Who pays for road damage or upgrades if construction overlaps? Read the Calder correspondence.

Noise, drainage and neighbours

Residents need the night-time noise modelling, including the combined effects of cooling equipment, transformers and generator testing. The same applies to drainage, native vegetation, cultural heritage, lighting and emergency access. Publish the studies and the proposed conditions, including who checks compliance and handles complaints.

Jobs and costs

Separate construction jobs from permanent jobs. Show their duration and any local hiring commitments. Disclose public grants, concessions and infrastructure support alongside the claimed benefits. None of those questions assumes a subsidy has been offered; they ask for the actual arrangements.

5. Public money: keep the battery and AI hub distinct

Victoria has invested $245 million through the SEC in the neighbouring Melbourne Renewable Energy Hub battery. That is not evidence of the same investment in the AI hub.

SEC’s 2025 Annual Report records 30% equity in each of the A1 and A2 battery entities, and 47% equity with 49% voting rights in A3. Equity, votes and contractual dispatch rights are different things. Ask for the arrangements rather than inferring control from one percentage.

The question is whether the proposed AI hub would share land, connections or power arrangements with the battery, and on what terms. Government should also explain how its investment, promotion and planning roles are kept separate.

The SEC’s 2025 report says the Victorian FOI Act does not apply to SEC Victoria. Relevant records held by departments or ministers may still be requested from those bodies. That route does not guarantee access to every SEC document.

6. The records to ask for

The open letter seeks disclosure now. If separate FOI applications become necessary, these seven sets of records give people a starting point. Narrow the date range and documents to what you need; copying a broad request seven times can mean unnecessary cost and delay.

Records held byWhat to requestWhy it matters
DTPCurrent plans, application reference, lodgement date, pathway advice and pre-application recordsEstablish the version being assessed and the public’s participation rights
DJSIRProject meetings, investment briefs and offers of assistanceEstablish what support was sought or offered
DEECACorrespondence about water, electricity, SEC involvement and shared infrastructureTest the proposed supply and public-asset arrangements
DPCFinal project briefs and arrangements for coordinating departments and managing conflictsIdentify who is responsible for a joined-up response
Planning MinisterHeld diary entries, meetings, briefings and correspondence about the proposalSee what reached the decision-maker
SEC MinisterBriefs and correspondence about supply contracts, land, connections or further investmentEstablish whether proposals involving public assets reached the minister
AI and Digital Economy MinisterMeetings and correspondence seeking support or expedited considerationSee what assistance was pursued across government

Melton Council, GWW, EPA and the relevant fire authorities may hold further records on roads, drainage, water, pollution and emergency planning. Ask each body for records it holds. A department and a minister can be separate FOI agencies even if they use the same contact inbox.

Costs and limits

OVIC lists a $34.50 application fee. Seven separate applications would therefore start at $241.50 before access charges; confirm the fee when lodging. A hardship waiver or reduction may be available. A public-interest argument alone does not automatically remove the application fee.

FOI concerns existing documents and has exemptions. It does not make an agency produce a new study. Valid requests generally have a 30-day decision period, with extensions possible. Check OVIC’s guidance.

The email tool on this page does not lodge or pay for those applications. It asks the five listed offices to coordinate disclosure and explain any separate process needed.

7. Put the answers somewhere people can find them

A single public project page should hold the current maps, revision history, studies, agency advice, consultation dates and decisions. Include the water and power arrangements, public spending, enforceable conditions and a named contact for questions.

Where part of a record genuinely needs protection, explain the reason and publish what can be released. Residents should not have to reconstruct the proposal from fragments just to take part in a decision that affects their homes.

Check the record.

Proposal figures are attributed to their dated sources. The nearby battery is an operating project; its ownership and approvals do not establish the ownership or approval of the proposed AI hub.

Calder Park Drive correspondence and timetable

For records that are not public, the letter asks the relevant body to identify, explain and disclose them. A missing record in this briefing is not proof that a record does not exist.